Equipment
Weplcv1euAdm
The planned cargo handling equipment as per the operating concept includes:
- Two new 100-tonne mobile harbor cranes with 30 movements per hour loading capacity
- Grain conveyor belt system connected to mobile ship loader with 800 tons per hour loading capacity from the main quay wall
- Five new reach stackers, two empty handlers, six forklift trucks – four with loading capacity 5t, one with 8t and one with 28t, eleven terminal trucks, seventeen terminal trailers, etc.
- IT systems for terminal and equipment operation
- The berth line extension will allow for grain loading with fixed equipment directly from the silos